How to calculate laytime used from a statement of facts

The statement of facts looks simple until you sit down to reconcile it against the charter party. Every port has its own habits for recording events, and every agent fills the form a little differently. The math itself is not hard. Getting the right numbers off the right lines is where laytime calculations go sideways.
Start with the three anchors on the SOF
Before any arithmetic, pull three timestamps off the statement of facts:
- NOR tendered: when the master handed in notice of readiness, and whether it was accepted or held until berth.
- Laytime commenced: this is often NOR tender plus the turn time in the charter party (six hours, twelve hours, whatever the fixture says), not the tender time itself.
- Completion of cargo operations: last hatch closed, hoses disconnected, or whatever the charter party defines as the end point.
Those three lines set the window. Everything else on the SOF is there to tell you what happened inside that window, and which hours inside it count against the laytime allowance.
Work through the SOF line by line
Once you have the window, go down every entry between start and completion and sort it into one of two buckets: time that counts, or time excluded under the charter party's laytime exceptions clause.
A typical SOF carries entries like:
0600 NOR tendered
0800 Vessel berthed
0930 Hoses connected, commenced loading
1400 Rain, operations suspended
1630 Rain stopped, operations resumed
2200 Completed loading
The rain stoppage is the line that matters here. If the charter party excludes "time lost due to weather" from laytime, those two hours and thirty minutes come off the clock even though the vessel sat alongside the whole time. Pull every exception line like that: Sunday and holiday exclusions if the fixture is Fridays/holidays excepted, shifting time between berths, waiting on surveyor or customs, bunkering if it stops cargo work. Each one is a separate deduction, and each has to trace back to actual wording in the charter party, not just common practice at that port.
Add up the hours between NOR acceptance (or commencement) and completion, subtract every excepted period, and what's left is laytime used. Compare that figure against laytime allowed, calculated from the cargo quantity and the loading or discharge rate in the fixture. If laytime used comes in under laytime allowed, there's nothing more to do. If it runs over, the difference is the demurrage exposure, and that's the number the owner's claim will be built on.
Where SOF reconciliation breaks down
Disputes rarely come from the arithmetic. They come from gaps between what the SOF says and what happened at anchor. A vessel can show NOR tendered at 0600 on a SOF signed by the agent, but if she was still sitting outside the fairway buoys with twenty other ships waiting for a berth, owners and charterers end up arguing over whether that tender was valid, and whether the queue period counts as congestion or a clean laytime run. Agents also sometimes round timestamps to the hour, miss a weather stoppage, or log "awaiting berth" without splitting out how much of that was port congestion versus the vessel's own readiness.
That's the gap a daily count of vessels sitting at anchor outside the port closes. If the SOF says the vessel tendered NOR at a given hour, cross-checking that against an independent read of how many ships were queued outside that anchorage on that date tells you whether the stated tender time holds up, or whether the congestion picture argues for a different laytime start. For a charterer sitting on a demurrage claim before the agent's paperwork is even final, that's often the first number worth having.
Laytime calculation itself is a known process, line by line off the SOF, exceptions matched to the charter party. What the SOF can't show is what was happening at the anchorage while those lines were being written, and that's the piece Port Congestion Watch is built to answer.